So after 8 weeks we are done with our bathroom remodel. This has been our winter project and one heck of a learning experience. We gutted the whole bathroom, which only took 2 hours between the two of us. So now we have tile floors, a tile shower, new vanity and fixtures, double sinks and a glass shower door. I can take credit for the design and labor but Matt did all the great tile work and plumbing which was the tedious stuff. I'm so glad we can work well together in such a small space :)
Before

After

Before

After

Before

After

Before

After


Before

After

Recently we needed a break from our construction zone so we went hiking to Whitewater State Park near Richmond, IN. Since Cody has been such a good sport with us taking over his "bedroom" during the remodel we wanted to spend some QT with him so he got to go hiking too.
Cody and Me after lunchtime.

My teddy bear being lazy while we slave away in the bathroom.